The method map
This map shows every process, technique and artifact this product knows, and how they connect to each other.
How to read this map
Every process, technique and artifact this catalog knows, with every tie between them drawn as a line. Three kinds, one shape each: a process — a step the method names, drawn as a filled square, tinted by its knowledge area; a technique — a way of doing one, drawn as a filled dot; an artifact — a document or record a process reads or produces, drawn as a filled diamond. Every shape opens its own summary below the map, on click or on Enter, and its own name shows on hover and on keyboard focus while its ties light up with it. Every shape still links onward too: its own process, technique or artifact page is in this export as well. A shape's summary and its ties show while you hover it or tab to it; press Space on a shape you have tabbed to to keep them up.
How to read this page
Shapes are process, technique or artifact; fill colour is knowledge area or technique family; a dashed line is optional. The legend below spells out every shape, fill and line. Filters and search narrow what is drawn; Fit/100%/+/− zoom the picture; a shape's own summary and ties show on hover, focus, or Space.
Shown without any project's reading: this export draws the method in theory. Washing these processes with one project's own progress is a read of the live product, not a page in this bundle.
Showing 219 of 219 nodes; 1106 relevant ties.
Every node and every tie at once, for exhaustive reading. Back to the process overview. Every process, technique and artifact page in this export links here, opening this page on its own node: that shape and its ties light up, and the node's entry in the lists below, open and complete with no script running, is where the link lands.
- Shape
- Process
- Technique
- Artifact
- Knowledge area (fill)
- Integration
- Scope
- Schedule
- Cost
- Quality
- Resource
- Communications
- Risk
- Procurement
- Stakeholder
- Tie (line)
- reads what it points to
- produces what it points to
- is used by what it points to
- feeds into what it points to
- is part of what it points to
- optional — may not exist for every project
Processes
- Develop Project Charter Develop Project Charter on the map
- produces Project Charter
- produces Assumption Log
- feeds into Plan Communications Management
- feeds into Plan Risk Management
- feeds into Identify Risks
- feeds into Perform Qualitative Risk Analysis
- feeds into Plan Procurement Management
- feeds into Identify Stakeholders
- feeds into Plan Stakeholder Engagement
- feeds into Develop Project Management Plan
- feeds into Monitor and Control Project Work
- feeds into Close Project or Phase
- feeds into Plan Scope Management
- feeds into Collect Requirements
- feeds into Define Scope
- feeds into Plan Schedule Management
- feeds into Plan Cost Management
- feeds into Plan Quality Management
- feeds into Plan Resource Management
- feeds into Estimate Activity Resources
- Develop Project Management Plan Develop Project Management Plan on the map
- produces Project Management Plan
- feeds into Plan Communications Management
- feeds into Monitor Communications
- feeds into Plan Risk Management
- feeds into Plan Procurement Management
- feeds into Control Procurements
- feeds into Plan Stakeholder Engagement
- feeds into Monitor Stakeholder Engagement
- feeds into Direct and Manage Project Work
- feeds into Manage Project Knowledge
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- feeds into Close Project or Phase
- feeds into Plan Scope Management
- feeds into Validate Scope
- feeds into Control Scope
- feeds into Plan Schedule Management
- feeds into Control Schedule
- feeds into Plan Cost Management
- feeds into Control Costs
- feeds into Plan Resource Management
- Direct and Manage Project Work Direct and Manage Project Work on the map
- produces Deliverables
- produces Work Performance Data
- produces Issue Log
- may produce Change Requests
- feeds into Manage Communications
- feeds into Monitor Communications
- feeds into Monitor Risks
- feeds into Control Procurements
- feeds into Manage Stakeholder Engagement
- feeds into Monitor Stakeholder Engagement
- feeds into Manage Project Knowledge
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- feeds into Validate Scope
- feeds into Control Scope
- feeds into Control Schedule
- feeds into Control Costs
- feeds into Control Quality
- feeds into Manage Team
- feeds into Control Resources
- Manage Project Knowledge Manage Project Knowledge on the map
- produces Lessons Learned Register
- may produce Project Management Plan
- feeds into Plan Communications Management
- feeds into Monitor Communications
- feeds into Plan Risk Management
- feeds into Plan Risk Responses
- feeds into Implement Risk Responses
- feeds into Monitor Risks
- feeds into Plan Procurement Management
- feeds into Control Procurements
- feeds into Plan Stakeholder Engagement
- feeds into Monitor Stakeholder Engagement
- feeds into Direct and Manage Project Work
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- feeds into Close Project or Phase
- feeds into Plan Scope Management
- feeds into Validate Scope
- feeds into Control Scope
- feeds into Plan Schedule Management
- feeds into Control Schedule
- feeds into Plan Cost Management
- feeds into Control Costs
- feeds into Manage Quality
- feeds into Plan Resource Management
- feeds into Develop Team
- feeds into Manage Team
- Monitor and Control Project Work Monitor and Control Project Work on the map
- produces Work Performance Reports
- may produce Change Requests
- feeds into Manage Communications
- feeds into Monitor Risks
- feeds into Perform Integrated Change Control
- feeds into Manage Team
- Perform Integrated Change Control Perform Integrated Change Control on the map
- may produce Approved Change Requests
- produces Change Log
- may produce Project Management Plan
- feeds into Plan Communications Management
- feeds into Manage Communications
- feeds into Monitor Communications
- feeds into Plan Risk Management
- feeds into Plan Procurement Management
- feeds into Control Procurements
- feeds into Plan Stakeholder Engagement
- feeds into Manage Stakeholder Engagement
- feeds into Monitor Stakeholder Engagement
- feeds into Direct and Manage Project Work
- feeds into Manage Project Knowledge
- feeds into Monitor and Control Project Work
- feeds into Close Project or Phase
- feeds into Plan Scope Management
- feeds into Validate Scope
- feeds into Control Scope
- feeds into Plan Schedule Management
- feeds into Control Schedule
- feeds into Plan Cost Management
- feeds into Control Costs
- feeds into Control Quality
- feeds into Plan Resource Management
- Close Project or Phase Close Project or Phase on the map
- produces Final Report
- produces Final Product Service Result
- produces Lessons Learned Register
- feeds into Monitor Communications
- feeds into Plan Risk Responses
- feeds into Implement Risk Responses
- feeds into Monitor Risks
- feeds into Direct and Manage Project Work
- feeds into Manage Project Knowledge
- feeds into Manage Quality
- feeds into Develop Team
- feeds into Manage Team
- Plan Scope Management Plan Scope Management on the map
- produces Scope Management Plan
- produces Requirements Management Plan
- feeds into Collect Requirements
- feeds into Define Scope
- feeds into Create WBS
- feeds into Plan Quality Management
- Collect Requirements Collect Requirements on the map
- produces Requirements Documentation
- produces Requirements Traceability Matrix
- feeds into Plan Communications Management
- feeds into Plan Procurement Management
- feeds into Define Scope
- feeds into Create WBS
- feeds into Validate Scope
- feeds into Control Scope
- feeds into Plan Quality Management
- feeds into Plan Resource Management
- Define Scope Define Scope on the map
- produces Project Scope Statement
- produces Assumption Log
- feeds into Identify Risks
- feeds into Perform Qualitative Risk Analysis
- feeds into Monitor and Control Project Work
- feeds into Collect Requirements
- feeds into Create WBS
- feeds into Sequence Activities
- feeds into Estimate Activity Resources
- Create WBS Create WBS on the map
- produces Scope Baseline
- feeds into Identify Risks
- feeds into Perform Qualitative Risk Analysis
- feeds into Perform Quantitative Risk Analysis
- feeds into Plan Procurement Management
- feeds into Perform Integrated Change Control
- feeds into Define Activities
- feeds into Estimate Costs
- feeds into Determine Budget
- feeds into Plan Quality Management
- feeds into Plan Resource Management
- feeds into Estimate Activity Resources
- Validate Scope Validate Scope on the map
- produces Accepted Deliverables
- produces Work Performance Information
- may produce Change Requests
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- feeds into Close Project or Phase
- Control Scope Control Scope on the map
- produces Work Performance Information
- may produce Change Requests
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- Plan Schedule Management Plan Schedule Management on the map
- produces Schedule Management Plan
- feeds into Define Activities
- feeds into Sequence Activities
- feeds into Estimate Activity Durations
- feeds into Develop Schedule
- Define Activities Define Activities on the map
- produces Activity List
- produces Activity Attributes
- produces Milestone List
- may produce Change Requests
- feeds into Direct and Manage Project Work
- feeds into Perform Integrated Change Control
- feeds into Sequence Activities
- feeds into Estimate Activity Durations
- feeds into Develop Schedule
- feeds into Estimate Activity Resources
- Sequence Activities Sequence Activities on the map
- produces Project Schedule Network Diagram
- produces Activity Attributes
- feeds into Estimate Activity Durations
- feeds into Develop Schedule
- feeds into Estimate Activity Resources
- Estimate Activity Durations Estimate Activity Durations on the map
- produces Duration Estimates
- produces Basis of Estimates
- feeds into Develop Schedule
- feeds into Determine Budget
- Develop Schedule Develop Schedule on the map
- produces Schedule Baseline
- produces Project Schedule
- produces Schedule Data
- produces Project Calendars
- feeds into Identify Risks
- feeds into Perform Quantitative Risk Analysis
- feeds into Control Schedule
- feeds into Estimate Costs
- feeds into Determine Budget
- feeds into Acquire Resources
- feeds into Develop Team
- feeds into Control Resources
- Control Schedule Control Schedule on the map
- produces Work Performance Information
- produces Schedule Forecasts
- may produce Change Requests
- produces Schedule Baseline
- feeds into Identify Risks
- feeds into Perform Quantitative Risk Analysis
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- Plan Cost Management Plan Cost Management on the map
- produces Cost Management Plan
- feeds into Estimate Costs
- feeds into Determine Budget
- Estimate Costs Estimate Costs on the map
- produces Cost Estimates
- produces Basis of Estimates
- feeds into Perform Quantitative Risk Analysis
- feeds into Determine Budget
- feeds into Estimate Activity Resources
- Determine Budget Determine Budget on the map
- produces Cost Baseline
- produces Project Funding Requirements
- feeds into Identify Risks
- feeds into Perform Quantitative Risk Analysis
- feeds into Plan Risk Responses
- feeds into Control Costs
- Control Costs Control Costs on the map
- produces Work Performance Information
- produces Cost Forecasts
- may produce Change Requests
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- Plan Quality Management Plan Quality Management on the map
- produces Quality Management Plan
- produces Quality Metrics
- may produce Project Management Plan
- feeds into Plan Communications Management
- feeds into Monitor Communications
- feeds into Plan Risk Management
- feeds into Plan Procurement Management
- feeds into Control Procurements
- feeds into Plan Stakeholder Engagement
- feeds into Monitor Stakeholder Engagement
- feeds into Direct and Manage Project Work
- feeds into Manage Project Knowledge
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- feeds into Close Project or Phase
- feeds into Plan Scope Management
- feeds into Validate Scope
- feeds into Control Scope
- feeds into Plan Schedule Management
- feeds into Control Schedule
- feeds into Plan Cost Management
- feeds into Estimate Costs
- feeds into Control Costs
- feeds into Manage Quality
- feeds into Control Quality
- feeds into Plan Resource Management
- Manage Quality Manage Quality on the map
- produces Quality Report
- produces Test and Evaluation Documents
- may produce Change Requests
- may produce Project Management Plan
- feeds into Plan Communications Management
- feeds into Manage Communications
- feeds into Monitor Communications
- feeds into Plan Risk Management
- feeds into Plan Procurement Management
- feeds into Control Procurements
- feeds into Plan Stakeholder Engagement
- feeds into Monitor Stakeholder Engagement
- feeds into Direct and Manage Project Work
- feeds into Manage Project Knowledge
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- feeds into Close Project or Phase
- feeds into Plan Scope Management
- feeds into Validate Scope
- feeds into Control Scope
- feeds into Plan Schedule Management
- feeds into Control Schedule
- feeds into Plan Cost Management
- feeds into Control Costs
- feeds into Control Quality
- feeds into Plan Resource Management
- Control Quality Control Quality on the map
- produces Quality Control Measurements
- produces Verified Deliverables
- produces Work Performance Information
- may produce Change Requests
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- feeds into Validate Scope
- feeds into Manage Quality
- Plan Resource Management Plan Resource Management on the map
- produces Resource Management Plan
- produces Team Charter
- produces Assumption Log
- feeds into Identify Risks
- feeds into Perform Qualitative Risk Analysis
- feeds into Plan Risk Responses
- feeds into Monitor and Control Project Work
- feeds into Collect Requirements
- feeds into Define Scope
- feeds into Estimate Activity Resources
- feeds into Acquire Resources
- feeds into Develop Team
- feeds into Manage Team
- feeds into Control Resources
- Estimate Activity Resources Estimate Activity Resources on the map
- produces Resource Requirements
- produces Basis of Estimates
- produces Resource Breakdown Structure
- feeds into Manage Project Knowledge
- feeds into Estimate Activity Durations
- feeds into Estimate Costs
- feeds into Determine Budget
- feeds into Acquire Resources
- feeds into Control Resources
- Acquire Resources Acquire Resources on the map
- produces Physical Resource Assignments
- produces Project Team Assignments
- produces Resource Calendars
- may produce Change Requests
- feeds into Manage Project Knowledge
- feeds into Perform Integrated Change Control
- feeds into Estimate Activity Durations
- feeds into Develop Schedule
- feeds into Estimate Activity Resources
- feeds into Develop Team
- feeds into Manage Team
- feeds into Control Resources
- Develop Team Develop Team on the map
- produces Team Performance Assessments
- may produce Change Requests
- feeds into Perform Integrated Change Control
- feeds into Manage Team
- Manage Team Manage Team on the map
- may produce Change Requests
- produces Issue Log
- produces Project Team Assignments
- feeds into Manage Communications
- feeds into Monitor Communications
- feeds into Monitor Risks
- feeds into Manage Stakeholder Engagement
- feeds into Monitor Stakeholder Engagement
- feeds into Manage Project Knowledge
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- feeds into Develop Team
- feeds into Control Resources
- Control Resources Control Resources on the map
- produces Work Performance Information
- may produce Change Requests
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- Plan Communications Management Plan Communications Management on the map
- produces Communications Management Plan
- may produce Project Management Plan
- feeds into Manage Communications
- feeds into Monitor Communications
- feeds into Plan Risk Management
- feeds into Plan Procurement Management
- feeds into Control Procurements
- feeds into Plan Stakeholder Engagement
- feeds into Manage Stakeholder Engagement
- feeds into Monitor Stakeholder Engagement
- feeds into Direct and Manage Project Work
- feeds into Manage Project Knowledge
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- feeds into Close Project or Phase
- feeds into Plan Scope Management
- feeds into Validate Scope
- feeds into Control Scope
- feeds into Plan Schedule Management
- feeds into Control Schedule
- feeds into Plan Cost Management
- feeds into Control Costs
- feeds into Plan Resource Management
- Manage Communications Manage Communications on the map
- produces Project Communications
- feeds into Monitor Communications
- feeds into Direct and Manage Project Work
- Monitor Communications Monitor Communications on the map
- produces Work Performance Information
- may produce Change Requests
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- Plan Risk Management Plan Risk Management on the map
- produces Risk Management Plan
- feeds into Identify Risks
- feeds into Perform Qualitative Risk Analysis
- feeds into Perform Quantitative Risk Analysis
- feeds into Plan Risk Responses
- feeds into Implement Risk Responses
- feeds into Monitor Risks
- feeds into Manage Stakeholder Engagement
- feeds into Plan Quality Management
- Identify Risks Identify Risks on the map
- produces Risk Register
- may produce Risk Report
- produces Assumption Log
- feeds into Perform Qualitative Risk Analysis
- feeds into Perform Quantitative Risk Analysis
- feeds into Plan Risk Responses
- feeds into Implement Risk Responses
- feeds into Monitor Risks
- feeds into Plan Procurement Management
- feeds into Control Procurements
- feeds into Monitor and Control Project Work
- feeds into Collect Requirements
- feeds into Define Scope
- feeds into Estimate Activity Durations
- feeds into Develop Schedule
- feeds into Estimate Costs
- feeds into Determine Budget
- feeds into Manage Quality
- feeds into Plan Resource Management
- feeds into Estimate Activity Resources
- Perform Qualitative Risk Analysis Perform Qualitative Risk Analysis on the map
- produces Risk Register
- may produce Risk Report
- produces Assumption Log
- feeds into Identify Risks
- feeds into Perform Quantitative Risk Analysis
- feeds into Plan Risk Responses
- feeds into Implement Risk Responses
- feeds into Monitor Risks
- feeds into Plan Procurement Management
- feeds into Control Procurements
- feeds into Monitor and Control Project Work
- feeds into Collect Requirements
- feeds into Define Scope
- feeds into Estimate Activity Durations
- feeds into Develop Schedule
- feeds into Estimate Costs
- feeds into Determine Budget
- feeds into Manage Quality
- feeds into Plan Resource Management
- feeds into Estimate Activity Resources
- Perform Quantitative Risk Analysis Perform Quantitative Risk Analysis on the map
- produces Risk Report
- feeds into Plan Risk Responses
- feeds into Implement Risk Responses
- feeds into Monitor Risks
- feeds into Manage Quality
- Plan Risk Responses Plan Risk Responses on the map
- may produce Change Requests
- produces Risk Register
- may produce Risk Report
- feeds into Perform Qualitative Risk Analysis
- feeds into Perform Quantitative Risk Analysis
- feeds into Implement Risk Responses
- feeds into Monitor Risks
- feeds into Plan Procurement Management
- feeds into Control Procurements
- feeds into Perform Integrated Change Control
- feeds into Define Scope
- feeds into Estimate Activity Durations
- feeds into Develop Schedule
- feeds into Estimate Costs
- feeds into Determine Budget
- feeds into Manage Quality
- feeds into Plan Resource Management
- feeds into Estimate Activity Resources
- Implement Risk Responses Implement Risk Responses on the map
- may produce Change Requests
- produces Risk Register
- may produce Risk Report
- feeds into Perform Qualitative Risk Analysis
- feeds into Perform Quantitative Risk Analysis
- feeds into Plan Risk Responses
- feeds into Monitor Risks
- feeds into Plan Procurement Management
- feeds into Control Procurements
- feeds into Perform Integrated Change Control
- feeds into Define Scope
- feeds into Estimate Activity Durations
- feeds into Develop Schedule
- feeds into Estimate Costs
- feeds into Determine Budget
- feeds into Manage Quality
- feeds into Plan Resource Management
- feeds into Estimate Activity Resources
- Monitor Risks Monitor Risks on the map
- produces Work Performance Information
- may produce Change Requests
- produces Risk Register
- may produce Risk Report
- feeds into Perform Qualitative Risk Analysis
- feeds into Perform Quantitative Risk Analysis
- feeds into Plan Risk Responses
- feeds into Implement Risk Responses
- feeds into Plan Procurement Management
- feeds into Control Procurements
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- feeds into Define Scope
- feeds into Estimate Activity Durations
- feeds into Develop Schedule
- feeds into Estimate Costs
- feeds into Determine Budget
- feeds into Manage Quality
- feeds into Plan Resource Management
- feeds into Estimate Activity Resources
- Plan Procurement Management Plan Procurement Management on the map
- produces Procurement Management Plan
- produces Procurement Strategy
- produces Bid Documents
- produces Procurement Statement of Work
- produces Source Selection Criteria
- produces Independent Cost Estimates
- feeds into Conduct Procurements
- Conduct Procurements Conduct Procurements on the map
- produces Selected Sellers
- produces Agreements
- may produce Change Requests
- feeds into Control Procurements
- feeds into Identify Stakeholders
- feeds into Plan Stakeholder Engagement
- feeds into Monitor Stakeholder Engagement
- feeds into Perform Integrated Change Control
- feeds into Close Project or Phase
- feeds into Determine Budget
- feeds into Control Resources
- Control Procurements Control Procurements on the map
- may produce Closed Procurements
- produces Work Performance Information
- may produce Change Requests
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- Identify Stakeholders Identify Stakeholders on the map
- produces Stakeholder Register
- may produce Change Requests
- feeds into Plan Communications Management
- feeds into Plan Risk Management
- feeds into Identify Risks
- feeds into Perform Qualitative Risk Analysis
- feeds into Plan Stakeholder Engagement
- feeds into Manage Project Knowledge
- feeds into Perform Integrated Change Control
- feeds into Collect Requirements
- feeds into Plan Quality Management
- feeds into Plan Resource Management
- Plan Stakeholder Engagement Plan Stakeholder Engagement on the map
- produces Stakeholder Engagement Plan
- feeds into Manage Communications
- feeds into Manage Stakeholder Engagement
- feeds into Monitor Stakeholder Engagement
- feeds into Collect Requirements
- feeds into Plan Quality Management
- Manage Stakeholder Engagement Manage Stakeholder Engagement on the map
- may produce Change Requests
- produces Issue Log
- feeds into Manage Communications
- feeds into Monitor Communications
- feeds into Monitor Risks
- feeds into Monitor Stakeholder Engagement
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
- feeds into Manage Team
- feeds into Control Resources
- Monitor Stakeholder Engagement Monitor Stakeholder Engagement on the map
- produces Work Performance Information
- may produce Change Requests
- feeds into Monitor and Control Project Work
- feeds into Perform Integrated Change Control
Techniques
- Advertising Advertising on the map
- is used by Conduct Procurements
- Agile Release Planning Agile Release Planning on the map
- is used by Develop Schedule
- Analogous Estimating Analogous Estimating on the map
- is used by Estimate Activity Durations
- is used by Estimate Costs
- is used by Estimate Activity Resources
- Audits Audits on the map
- is used by Manage Quality
- is used by Monitor Risks
- Autocratic Decision Making Autocratic Decision Making on the map
- is used by Collect Requirements
- Benchmarking Benchmarking on the map
- is used by Collect Requirements
- Bidder Conferences Bidder Conferences on the map
- is used by Conduct Procurements
- Bottom Up Estimating Bottom Up Estimating on the map
- is used by Estimate Activity Durations
- is used by Estimate Costs
- is used by Estimate Activity Resources
- Change Control Tools Change Control Tools on the map
- is used by Perform Integrated Change Control
- Claims Administration Claims Administration on the map
- is used by Control Procurements
- Colocation Colocation on the map
- is used by Develop Team
- Communication Methods Communication Methods on the map
- is used by Plan Communications Management
- is used by Manage Communications
- Communication Models Communication Models on the map
- is used by Plan Communications Management
- Communication Requirements Analysis Communication Requirements Analysis on the map
- is used by Plan Communications Management
- Communication Skills Communication Skills on the map
- is used by Manage Communications
- is used by Manage Stakeholder Engagement
- is used by Monitor Stakeholder Engagement
- Communication Technology Communication Technology on the map
- is used by Plan Communications Management
- is used by Manage Communications
- Conflict Management Conflict Management on the map
- is used by Manage Team
- Context Diagram Context Diagram on the map
- is used by Collect Requirements
- Contingent Response Strategies Contingent Response Strategies on the map
- is used by Plan Risk Responses
- Cost Aggregation Cost Aggregation on the map
- is used by Determine Budget
- Cost of Quality Cost of Quality on the map
- is used by Plan Quality Management
- Critical Chain Method Critical Chain Method on the map
- Critical Path Method Critical Path Method on the map
- is used by Develop Schedule
- is used by Control Schedule
- Data Analysis Data Analysis on the map
- is used by Monitor and Control Project Work
- is used by Perform Integrated Change Control
- is used by Close Project or Phase
- is used by Plan Scope Management
- is used by Collect Requirements
- is used by Define Scope
- is used by Control Scope
- is used by Plan Schedule Management
- is used by Estimate Activity Durations
- is used by Control Schedule
- is used by Plan Cost Management
- is used by Estimate Costs
- is used by Determine Budget
- is used by Control Costs
- is used by Plan Quality Management
- is used by Manage Quality
- is used by Control Quality
- is used by Estimate Activity Resources
- is used by Control Resources
- is used by Monitor Communications
- is used by Plan Risk Management
- is used by Identify Risks
- is used by Monitor Risks
- is used by Plan Procurement Management
- is used by Control Procurements
- is used by Identify Stakeholders
- is used by Plan Stakeholder Engagement
- is used by Monitor Stakeholder Engagement
- Data Gathering Data Gathering on the map
- is used by Develop Project Charter
- is used by Develop Project Management Plan
- is used by Collect Requirements
- is used by Plan Quality Management
- is used by Control Quality
- is used by Identify Risks
- is used by Perform Qualitative Risk Analysis
- is used by Plan Risk Responses
- is used by Plan Procurement Management
- is used by Identify Stakeholders
- is used by Plan Stakeholder Engagement
- Data Representation Data Representation on the map
- is used by Collect Requirements
- is used by Plan Quality Management
- is used by Control Quality
- is used by Plan Resource Management
- is used by Plan Communications Management
- is used by Monitor Communications
- is used by Perform Qualitative Risk Analysis
- is used by Identify Stakeholders
- is used by Plan Stakeholder Engagement
- is used by Monitor Stakeholder Engagement
- Decision Making Decision Making on the map
- is used by Monitor and Control Project Work
- is used by Perform Integrated Change Control
- is used by Collect Requirements
- is used by Define Scope
- is used by Validate Scope
- is used by Plan Quality Management
- is used by Acquire Resources
- is used by Plan Risk Responses
- is used by Plan Stakeholder Engagement
- is used by Monitor Stakeholder Engagement
- Decision Tree Analysis Decision Tree Analysis on the map
- is used by Perform Quantitative Risk Analysis
- Decomposition Decomposition on the map
- is used by Create WBS
- is used by Define Activities
- Dependency Determination Dependency Determination on the map
- is used by Sequence Activities
- Design for X Design for X on the map
- is used by Manage Quality
- Earned Value Analysis Earned Value Analysis on the map
- is used by Control Costs
- Expert Judgment Expert Judgment on the map
- is used by Develop Project Charter
- is used by Develop Project Management Plan
- is used by Direct and Manage Project Work
- is used by Manage Project Knowledge
- is used by Monitor and Control Project Work
- is used by Perform Integrated Change Control
- is used by Close Project or Phase
- is used by Plan Scope Management
- is used by Collect Requirements
- is used by Define Scope
- is used by Create WBS
- is used by Plan Schedule Management
- is used by Define Activities
- is used by Estimate Activity Durations
- is used by Plan Cost Management
- is used by Estimate Costs
- is used by Determine Budget
- is used by Control Costs
- is used by Plan Quality Management
- is used by Plan Resource Management
- is used by Estimate Activity Resources
- is used by Plan Communications Management
- is used by Monitor Communications
- is used by Plan Risk Management
- is used by Identify Risks
- is used by Perform Qualitative Risk Analysis
- is used by Perform Quantitative Risk Analysis
- is used by Plan Risk Responses
- is used by Implement Risk Responses
- is used by Plan Procurement Management
- is used by Conduct Procurements
- is used by Control Procurements
- is used by Identify Stakeholders
- is used by Plan Stakeholder Engagement
- is used by Manage Stakeholder Engagement
- Financing Financing on the map
- is used by Determine Budget
- Focus Groups Focus Groups on the map
- is used by Collect Requirements
- Funding Limit Reconciliation Funding Limit Reconciliation on the map
- is used by Determine Budget
- Ground Rules Ground Rules on the map
- is used by Manage Stakeholder Engagement
- Historical Information Review Historical Information Review on the map
- is used by Determine Budget
- Individual and Team Assessments Individual and Team Assessments on the map
- is used by Develop Team
- Influence Diagrams Influence Diagrams on the map
- is used by Perform Quantitative Risk Analysis
- Influencing Influencing on the map
- is used by Manage Team
- is used by Control Resources
- Information Management Information Management on the map
- is used by Manage Project Knowledge
- Inspection Inspection on the map
- is used by Validate Scope
- is used by Control Quality
- Inspections and Audits Inspections and Audits on the map
- is used by Control Procurements
- Interpersonal and Team Skills Interpersonal and Team Skills on the map
- is used by Develop Project Charter
- is used by Develop Project Management Plan
- is used by Manage Project Knowledge
- is used by Collect Requirements
- is used by Define Scope
- is used by Acquire Resources
- is used by Develop Team
- is used by Manage Team
- is used by Control Resources
- is used by Plan Communications Management
- is used by Manage Communications
- is used by Monitor Communications
- is used by Identify Risks
- is used by Plan Risk Responses
- is used by Implement Risk Responses
- is used by Conduct Procurements
- is used by Manage Stakeholder Engagement
- is used by Monitor Stakeholder Engagement
- Knowledge Management Knowledge Management on the map
- is used by Manage Project Knowledge
- Leads and Lags Leads and Lags on the map
- is used by Sequence Activities
- is used by Develop Schedule
- Make-or-Buy Analysis Make-or-Buy Analysis on the map
- is used by Plan Procurement Management
- Meetings Meetings on the map
- is used by Develop Project Charter
- is used by Develop Project Management Plan
- is used by Direct and Manage Project Work
- is used by Monitor and Control Project Work
- is used by Perform Integrated Change Control
- is used by Close Project or Phase
- is used by Plan Scope Management
- is used by Plan Schedule Management
- is used by Define Activities
- is used by Plan Cost Management
- is used by Control Quality
- is used by Plan Resource Management
- is used by Plan Communications Management
- is used by Manage Communications
- is used by Monitor Communications
- is used by Plan Risk Management
- is used by Identify Risks
- is used by Perform Qualitative Risk Analysis
- is used by Monitor Risks
- is used by Plan Procurement Management
- is used by Identify Stakeholders
- is used by Plan Stakeholder Engagement
- is used by Manage Stakeholder Engagement
- is used by Monitor Stakeholder Engagement
- Multicriteria Decision Analysis Multicriteria Decision Analysis on the map
- is used by Collect Requirements
- Negotiation Negotiation on the map
- is used by Acquire Resources
- Organizational Theory Organizational Theory on the map
- is used by Plan Resource Management
- Parametric Estimating Parametric Estimating on the map
- is used by Estimate Activity Durations
- is used by Estimate Costs
- is used by Estimate Activity Resources
- Pre Assignment Pre Assignment on the map
- is used by Acquire Resources
- Precedence Diagramming Method Precedence Diagramming Method on the map
- is used by Sequence Activities
- Problem Solving Problem Solving on the map
- is used by Manage Quality
- is used by Control Resources
- Procurement Performance Reviews Procurement Performance Reviews on the map
- is used by Control Procurements
- Product Analysis Product Analysis on the map
- is used by Define Scope
- Project Management Information System Project Management Information System on the map
- is used by Direct and Manage Project Work
- is used by Sequence Activities
- is used by Control Schedule
- is used by Control Costs
- is used by Estimate Activity Resources
- is used by Manage Team
- is used by Control Resources
- is used by Manage Communications
- is used by Monitor Communications
- is used by Implement Risk Responses
- Project Reporting Project Reporting on the map
- is used by Manage Communications
- Prompt Lists Prompt Lists on the map
- is used by Identify Risks
- Proposal Evaluation Proposal Evaluation on the map
- is used by Conduct Procurements
- Prototypes Prototypes on the map
- is used by Collect Requirements
- Quality Improvement Methods Quality Improvement Methods on the map
- is used by Manage Quality
- Recognition and Rewards Recognition and Rewards on the map
- is used by Develop Team
- Representations of Uncertainty Representations of Uncertainty on the map
- is used by Perform Quantitative Risk Analysis
- Reserve Analysis Reserve Analysis on the map
- is used by Control Costs
- Resource Optimization Resource Optimization on the map
- is used by Develop Schedule
- Risk Categorization Risk Categorization on the map
- is used by Perform Qualitative Risk Analysis
- Risk Probability and Impact Assessment Risk Probability and Impact Assessment on the map
- is used by Perform Qualitative Risk Analysis
- Rolling Wave Planning Rolling Wave Planning on the map
- is used by Define Activities
- Root Cause Analysis Root Cause Analysis on the map
- is used by Manage Quality
- Schedule Compression Schedule Compression on the map
- is used by Develop Schedule
- Schedule Network Analysis Schedule Network Analysis on the map
- is used by Develop Schedule
- Sensitivity Analysis Sensitivity Analysis on the map
- is used by Perform Quantitative Risk Analysis
- Simulation Simulation on the map
- is used by Perform Quantitative Risk Analysis
- Source Selection Analysis Source Selection Analysis on the map
- is used by Plan Procurement Management
- Stakeholder Analysis Stakeholder Analysis on the map
- is used by Plan Risk Management
- is used by Identify Stakeholders
- Stakeholder Engagement Assessment Matrix Stakeholder Engagement Assessment Matrix on the map
- is used by Monitor Stakeholder Engagement
- Strategies for Opportunities Strategies for Opportunities on the map
- is used by Plan Risk Responses
- Strategies for Overall Project Risk Strategies for Overall Project Risk on the map
- is used by Plan Risk Responses
- Strategies for Threats Strategies for Threats on the map
- is used by Plan Risk Responses
- Team Building Team Building on the map
- is used by Develop Team
- Test and Inspection Planning Test and Inspection Planning on the map
- is used by Plan Quality Management
- Testing Product Evaluations Testing Product Evaluations on the map
- is used by Control Quality
- Three Point Estimating Three Point Estimating on the map
- is used by Estimate Activity Durations
- is used by Estimate Costs
- To-Complete Performance Index To-Complete Performance Index on the map
- is used by Control Costs
- Training Training on the map
- is used by Develop Team
- Virtual Teams Virtual Teams on the map
- is used by Acquire Resources
- is used by Develop Team
- Voting Voting on the map
- is used by Collect Requirements
Artifacts
- Accepted Deliverables Accepted Deliverables on the map
- reads Close Project or Phase
- Activity Attributes Activity Attributes on the map
- reads Sequence Activities
- reads Estimate Activity Durations
- reads Develop Schedule
- reads Estimate Activity Resources
- Activity List Activity List on the map
- reads Sequence Activities
- reads Estimate Activity Durations
- reads Develop Schedule
- reads Estimate Activity Resources
- Agreements Agreements on the map
- reads Close Project or Phase
- reads Determine Budget
- reads Control Resources
- reads Control Procurements
- reads Identify Stakeholders
- reads Plan Stakeholder Engagement
- reads Monitor Stakeholder Engagement
- Agreements Initial Agreements Initial on the map
- reads Develop Project Charter
- Approved Change Requests Approved Change Requests on the map
- reads Direct and Manage Project Work
- reads Control Quality
- reads Control Procurements
- Assumption Log Assumption Log on the map
- reads Monitor and Control Project Work
- reads Collect Requirements
- reads Define Scope
- reads Estimate Activity Resources
- reads Identify Risks
- reads Perform Qualitative Risk Analysis
- Basis of Estimates Basis of Estimates on the map
- reads Determine Budget
- Benefits Management Plan Benefits Management Plan on the map
- reads Develop Project Charter
- reads Identify Stakeholders
- Bid Documents Bid Documents on the map
- reads Conduct Procurements
- Business Case Business Case on the map
- reads Develop Project Charter
- reads Close Project or Phase
- reads Plan Procurement Management
- reads Identify Stakeholders
- Change Log Change Log on the map
- reads Direct and Manage Project Work
- reads Manage Communications
- reads Manage Stakeholder Engagement
- Change Management Plan Change Management Plan on the map
- reads Perform Integrated Change Control
- Change Requests Change Requests on the map
- reads Perform Integrated Change Control
- Closed Procurements Closed Procurements on the map
- Communications Management Plan Communications Management Plan on the map
- reads Manage Communications
- reads Manage Stakeholder Engagement
- Configuration Management Plan Configuration Management Plan on the map
- reads Perform Integrated Change Control
- Cost Baseline Cost Baseline on the map
- reads Identify Risks
- reads Perform Quantitative Risk Analysis
- reads Plan Risk Responses
- Cost Estimates Cost Estimates on the map
- reads Determine Budget
- reads Estimate Activity Resources
- reads Perform Quantitative Risk Analysis
- Cost Forecasts Cost Forecasts on the map
- reads Monitor and Control Project Work
- Cost Management Plan Cost Management Plan on the map
- reads Estimate Costs
- reads Determine Budget
- Deliverables Deliverables on the map
- reads Manage Project Knowledge
- reads Control Quality
- Development Approach Development Approach on the map
- is part of Project Management Plan
- Duration Estimates Duration Estimates on the map
- reads Develop Schedule
- Enterprise Environmental Factors Enterprise Environmental Factors on the map
- reads Develop Project Charter
- reads Develop Project Management Plan
- reads Direct and Manage Project Work
- reads Manage Project Knowledge
- reads Perform Integrated Change Control
- reads Plan Scope Management
- reads Create WBS
- reads Plan Schedule Management
- reads Define Activities
- reads Sequence Activities
- reads Estimate Activity Durations
- reads Plan Cost Management
- reads Estimate Costs
- reads Plan Resource Management
- reads Acquire Resources
- reads Plan Communications Management
- reads Monitor Communications
- reads Plan Risk Management
- reads Identify Risks
- reads Perform Qualitative Risk Analysis
- reads Plan Procurement Management
- reads Control Procurements
- reads Identify Stakeholders
- reads Plan Stakeholder Engagement
- Final Product Service Result Final Product Service Result on the map
- Final Report Final Report on the map
- Independent Cost Estimates Independent Cost Estimates on the map
- Issue Log Issue Log on the map
- reads Monitor and Control Project Work
- reads Manage Team
- reads Control Resources
- reads Manage Communications
- reads Monitor Communications
- reads Monitor Risks
- reads Manage Stakeholder Engagement
- reads Monitor Stakeholder Engagement
- Lessons Learned Register Lessons Learned Register on the map
- reads Direct and Manage Project Work
- reads Manage Project Knowledge
- reads Manage Quality
- reads Develop Team
- reads Manage Team
- reads Monitor Communications
- reads Plan Risk Responses
- reads Implement Risk Responses
- reads Monitor Risks
- Milestone List Milestone List on the map
- reads Direct and Manage Project Work
- reads Sequence Activities
- reads Estimate Activity Durations
- Organizational Process Assets Organizational Process Assets on the map
- reads Develop Project Charter
- reads Develop Project Management Plan
- reads Direct and Manage Project Work
- reads Manage Project Knowledge
- reads Monitor and Control Project Work
- reads Perform Integrated Change Control
- reads Close Project or Phase
- reads Plan Scope Management
- reads Define Scope
- reads Create WBS
- reads Control Scope
- reads Plan Schedule Management
- reads Define Activities
- reads Sequence Activities
- reads Control Schedule
- reads Plan Cost Management
- reads Estimate Costs
- reads Control Costs
- reads Manage Quality
- reads Plan Resource Management
- reads Acquire Resources
- reads Plan Communications Management
- reads Monitor Communications
- reads Plan Risk Management
- reads Implement Risk Responses
- reads Plan Procurement Management
- reads Identify Stakeholders
- reads Plan Stakeholder Engagement
- reads Manage Stakeholder Engagement
- reads Monitor Stakeholder Engagement
- Performance Measurement Baseline Performance Measurement Baseline on the map
- is part of Project Management Plan
- Physical Resource Assignments Physical Resource Assignments on the map
- reads Control Resources
- Procurement Documentation Procurement Documentation on the map
- reads Close Project or Phase
- reads Conduct Procurements
- reads Control Procurements
- Procurement Management Plan Procurement Management Plan on the map
- reads Conduct Procurements
- Procurement Statement of Work Procurement Statement of Work on the map
- reads Conduct Procurements
- Procurement Strategy Procurement Strategy on the map
- Project Calendars Project Calendars on the map
- reads Control Schedule
- Project Charter Project Charter on the map
- reads Develop Project Management Plan
- reads Close Project or Phase
- reads Plan Scope Management
- reads Collect Requirements
- reads Define Scope
- reads Plan Schedule Management
- reads Plan Cost Management
- reads Plan Quality Management
- reads Plan Resource Management
- reads Plan Communications Management
- reads Plan Risk Management
- reads Plan Procurement Management
- reads Identify Stakeholders
- reads Plan Stakeholder Engagement
- Project Communications Project Communications on the map
- reads Direct and Manage Project Work
- reads Monitor Communications
- Project Funding Requirements Project Funding Requirements on the map
- reads Control Costs
- Project Management Plan Project Management Plan on the map
- reads Direct and Manage Project Work
- reads Manage Project Knowledge
- reads Monitor and Control Project Work
- reads Perform Integrated Change Control
- reads Close Project or Phase
- reads Plan Scope Management
- reads Validate Scope
- reads Control Scope
- reads Plan Schedule Management
- reads Control Schedule
- reads Plan Cost Management
- reads Control Costs
- reads Plan Resource Management
- reads Plan Communications Management
- reads Monitor Communications
- reads Plan Risk Management
- reads Plan Procurement Management
- reads Control Procurements
- reads Plan Stakeholder Engagement
- reads Monitor Stakeholder Engagement
- Project Schedule Project Schedule on the map
- reads Control Schedule
- reads Estimate Costs
- reads Determine Budget
- reads Acquire Resources
- reads Develop Team
- reads Control Resources
- Project Schedule Network Diagram Project Schedule Network Diagram on the map
- reads Develop Schedule
- Project Scope Statement Project Scope Statement on the map
- reads Create WBS
- reads Sequence Activities
- Project Team Assignments Project Team Assignments on the map
- reads Manage Project Knowledge
- reads Develop Team
- reads Manage Team
- Quality Control Measurements Quality Control Measurements on the map
- reads Manage Quality
- Quality Management Plan Quality Management Plan on the map
- reads Estimate Costs
- reads Manage Quality
- reads Control Quality
- Quality Metrics Quality Metrics on the map
- reads Manage Quality
- reads Control Quality
- Quality Report Quality Report on the map
- reads Manage Communications
- Requirements Documentation Requirements Documentation on the map
- reads Define Scope
- reads Create WBS
- reads Validate Scope
- reads Control Scope
- reads Plan Quality Management
- reads Plan Resource Management
- reads Plan Communications Management
- reads Plan Procurement Management
- Requirements Management Plan Requirements Management Plan on the map
- reads Collect Requirements
- reads Plan Quality Management
- Requirements Traceability Matrix Requirements Traceability Matrix on the map
- reads Validate Scope
- reads Control Scope
- Resource Breakdown Structure Resource Breakdown Structure on the map
- reads Manage Project Knowledge
- reads Control Resources
- Resource Calendars Resource Calendars on the map
- reads Estimate Activity Durations
- reads Develop Schedule
- reads Estimate Activity Resources
- reads Acquire Resources
- reads Develop Team
- Resource Management Plan Resource Management Plan on the map
- reads Estimate Activity Resources
- reads Acquire Resources
- reads Develop Team
- reads Manage Team
- reads Control Resources
- reads Plan Risk Responses
- Resource Requirements Resource Requirements on the map
- reads Estimate Activity Durations
- reads Estimate Costs
- reads Acquire Resources
- reads Control Resources
- Risk Management Plan Risk Management Plan on the map
- reads Plan Quality Management
- reads Identify Risks
- reads Perform Qualitative Risk Analysis
- reads Perform Quantitative Risk Analysis
- reads Plan Risk Responses
- reads Implement Risk Responses
- reads Monitor Risks
- reads Manage Stakeholder Engagement
- Risk Register Risk Register on the map
- reads Define Scope
- reads Estimate Activity Durations
- reads Develop Schedule
- reads Estimate Costs
- reads Determine Budget
- reads Plan Resource Management
- reads Estimate Activity Resources
- reads Perform Qualitative Risk Analysis
- reads Perform Quantitative Risk Analysis
- reads Plan Risk Responses
- reads Implement Risk Responses
- reads Monitor Risks
- reads Plan Procurement Management
- reads Control Procurements
- Risk Report Risk Report on the map
- reads Manage Quality
- reads Plan Risk Responses
- reads Implement Risk Responses
- reads Monitor Risks
- Schedule Baseline Schedule Baseline on the map
- reads Identify Risks
- reads Perform Quantitative Risk Analysis
- Schedule Data Schedule Data on the map
- reads Control Schedule
- Schedule Forecasts Schedule Forecasts on the map
- reads Monitor and Control Project Work
- Schedule Management Plan Schedule Management Plan on the map
- reads Define Activities
- reads Sequence Activities
- reads Estimate Activity Durations
- reads Develop Schedule
- Scope Baseline Scope Baseline on the map
- reads Perform Integrated Change Control
- reads Define Activities
- reads Estimate Costs
- reads Determine Budget
- reads Plan Quality Management
- reads Plan Resource Management
- reads Estimate Activity Resources
- reads Identify Risks
- reads Perform Qualitative Risk Analysis
- reads Perform Quantitative Risk Analysis
- reads Plan Procurement Management
- Scope Management Plan Scope Management Plan on the map
- reads Collect Requirements
- reads Define Scope
- reads Create WBS
- Selected Sellers Selected Sellers on the map
- Seller Proposals Seller Proposals on the map
- reads Conduct Procurements
- Source Selection Criteria Source Selection Criteria on the map
- reads Conduct Procurements
- Stakeholder Engagement Plan Stakeholder Engagement Plan on the map
- reads Collect Requirements
- reads Plan Quality Management
- reads Manage Communications
- reads Manage Stakeholder Engagement
- reads Monitor Stakeholder Engagement
- Stakeholder Register Stakeholder Register on the map
- reads Manage Project Knowledge
- reads Collect Requirements
- reads Plan Quality Management
- reads Plan Resource Management
- reads Plan Communications Management
- reads Plan Risk Management
- reads Identify Risks
- reads Perform Qualitative Risk Analysis
- reads Plan Stakeholder Engagement
- Team Charter Team Charter on the map
- reads Develop Team
- reads Manage Team
- Team Performance Assessments Team Performance Assessments on the map
- reads Manage Team
- Test and Evaluation Documents Test and Evaluation Documents on the map
- reads Control Quality
- Verified Deliverables Verified Deliverables on the map
- reads Validate Scope
- Work Breakdown Structure Work Breakdown Structure on the map
- is part of Scope Baseline
- Work Performance Data Work Performance Data on the map
- reads Validate Scope
- reads Control Scope
- reads Control Schedule
- reads Control Costs
- reads Control Quality
- reads Control Resources
- reads Monitor Communications
- reads Monitor Risks
- reads Control Procurements
- reads Monitor Stakeholder Engagement
- Work Performance Information Work Performance Information on the map
- reads Monitor and Control Project Work
- Work Performance Reports Work Performance Reports on the map
- reads Perform Integrated Change Control
- reads Manage Team
- reads Manage Communications
- reads Monitor Risks