driftless
Search As of 2026-07-01

A greyed-out label above marks a link this fixed demo does not ship: only the story project's pages go this deep, and an action a live reader could take here (signing in, applying a technique) is disabled in a read-only export.

Weekly status — Route Optimization Pilot

As of 2026-07-01 · Process map

Percent complete is 0%, stamped from the tasks — it is not entered here, so the reading can never disagree with the work done.

No status history yet — there is no dated series to draw a trend through

Save this week's RAG in the form at the foot of this page (or POST /status-snapshots) and it becomes the first point; the line gains a slope from the second reading, since a rate needs two dates to be read between.

No cost baseline yet — there is no planned curve to draw the spend against

Draft a baseline, add its lines, then approve it (POST /baselines, POST /baseline-lines, PATCH /baselines/<id> — approval freezes the plan, so the lines go in first), then record spend (POST /cost-entries); the wizard can produce the approved plan for you, and both curves appear here as soon as the approved version has lines.